Sprint 7
Adailson Santos edited this page Jul 7, 2017
·
5 revisions
| Sprint Backlog |
|---|
| Integrate clinical record |
| Login autentication |
| Refactor code |
| Integrate vacination |
| Product Owner |
|---|
| Antonio Carvalho |
| Scrum Master |
|---|
| No one. |
| Developers |
|---|
| Adailson Santos |
| Antonio Carvalho |
| Flávio da Costa |
| Gustavo Vieira |
| João Paulo Ferreira |
| Leonardo Sagmeister |
| Luiz Guilherme |
| Mateus Roriz |
| Varley Silva |
Like the previous sprint, only the team of programming techniques that gave continuity and finalized the project. In its last sprint, the team developed almost all planned activities, with the exception of login authentication. In this way, the system was able to be used in a veterinary clinic. The team decided it had no relevance to using a Scrum Master in the last sprint as the team became mature enough in the project.
- Management Plan
- Requirements Management Plan
- Non Functional Requirements
- Entity Relationship Model
- Risk Plan
- Chronogram
- Costs
- Scenarios and Lexicons
-
C1UC3 - Maintain Clinical Record