Skip to content

chore: Improve block node protobuf devex (#1135) #123

chore: Improve block node protobuf devex (#1135)

chore: Improve block node protobuf devex (#1135) #123

Triggered via push May 20, 2025 02:02
Status Failure
Total duration 1h 30m 52s
Artifacts
smart-contracts-tests  /  Local Node Acceptance Tests
1h 30m
smart-contracts-tests / Local Node Acceptance Tests
Fit to window
Zoom out
Zoom in

Annotations

2 errors
smart-contracts-tests / Local Node Acceptance Tests
The job running on runner hiero-block-node-linux-medium-6gz8p-runner-mq7vt has exceeded the maximum execution time of 90 minutes.
smart-contracts-tests / Local Node Acceptance Tests
The operation was canceled.